Send Message
JEFFER Engineering and Technology Co.,Ltd
JEFFER Engineering and Technology Co.,Ltd
products
Home /

products

ISO45001 50TPD End Fired Furnace For Glass Production Line

Product Details

Place of Origin: China

Brand Name: JEFFER

Certification: ISO9001, ISO90014, ISO45001

Model Number: Customized

Payment & Shipping Terms

Minimum Order Quantity: 1 set

Price: Negotiable

Packaging Details: Wooden case, steel frame

Delivery Time: 150 days after received the down payment

Payment Terms: T/T, L/C

Supply Ability: 1 set per 5 month

Get Best Price
Contact Now
Specifications
High Light:

50TPD End Fired Furnace

,

ISO45001 50TPD glass melter

,

ISO45001 End Fired Furnace

Material:
Mild Steel
Voltage:
380V, 50Hz
Application:
Glass Industry
Product:
Glass Product
Raw Material:
Silica Sand
Waranty:
One Year
Energy:
Natural Gas
Color Of Product:
Customized
Service:
Engineers Available To Service Machinery Overseas
Supervisor:
Available
Material:
Mild Steel
Voltage:
380V, 50Hz
Application:
Glass Industry
Product:
Glass Product
Raw Material:
Silica Sand
Waranty:
One Year
Energy:
Natural Gas
Color Of Product:
Customized
Service:
Engineers Available To Service Machinery Overseas
Supervisor:
Available
Description
ISO45001 50TPD End Fired Furnace For Glass Production Line

Melting Capacity 50TPD, End Fired Furnace, For Glass Production Line

 

 

1. Brief Description

 

The end fired furnace is named by the longitudinal arrangement of the burner port and the U shape of flame combustion route. At present, the end fired furnace is more widely used in the glass industry.

 

The melting process is divided into five stages as following, each section has its inner connection, affecting each other. If one stage has imperfect performance, it will influence the next stage, and ultimately affect the quality of glass.

 

Glass melting is the most important process in glass production, it is a forming process where the batched materials form a qualified liquid evenly with no bubbles under high temperature heating.

 

ISO45001 50TPD End Fired Furnace For Glass Production Line 0

 

2. Advantage 

 

1 Long Flame
2 High efficiency of heat utilization
3 Low energy consumption
4 Lower investment
5 Smal foot print

 

 

3. Factors that influence the melting effects

 

1 Characteristic of raw materials
2 Chemical compon
3 Material feeding method
4 Melting temperature

 

 

4. Main sections of furnace

 

  • Working tank

Normally, the semidiameter of working tank is equal to the width of the melting tank, the depth of the working tank is less than 300mm-400mm of the melting tank.

 

  • Dog house
Normally, the temperature of the dog house is about 1100°C~1400°C. The batched materials will be pre-melted at this section.
 
  • Port
It is the place where the fuel is mixed with the preheated air, also an access for the preheated air in to the furnace and exhausting the waste gas out.
 
  • Flame space
Flame space is a space which is combined with breast wall, crown, and front and back gable wall. 
 
  • Throat
Throat is a core section of the furnace, it will affect the quality of glass and furnace campaign. The temperature of glass will reduce when flowing through the throat.
 
  • Regenerator
The regenerator can heat the combustion air by exhausted gas coming out from the furnace with the help of checker brick. It can not only utilize the waste heat of gas, but also it can heat the combustion air to a higher temperature, which is useful to increase the working temperature. The waste gas can exhaust and the combustion air can go into the access.

 

Send your inquiry
Please send us your request and we will reply to you as soon as possible.
Send